350T Maize intensive processing equipment installation site in South America
HBA
4086 Views
11-02-2020
The steel structure workshop of the equipment has been successfully installed. The equipment hoisting conditions are already available. At present, the installation work of flour machinery is proceeding in an orderly manner.
Get The Latest Quote